Skip to content
Ashlane

Changelog

Changes to the network, CLI, SDK and dashboard in 2026. Breaking changes are announced 90 days ahead on this page and by email to account owners.

Launcher SDK 3.4.0

  • NewResumable installs after the disk fills, keeping every verified chunk.
  • NewAdaptive throttle that backs off when other traffic on the link slows down.
  • FixedRust: progress callbacks could fire after apply() returned on cancel.

Dashboard: rollout guardrails

  • NewGuardrails pause a rollout when install failures exceed a threshold you set. Default: 2% for ten minutes.
  • NewOn-call contacts per title, with paging by phone call or webhook.
  • ChangedRollout percentage now moves in 1% steps from the first release.

Chisel delta engine 2.9

  • NewBranch-target normalisation for Mach-O binaries, matching PE and ELF.
  • ChangedBackground recompression to zstd 19 starts after 5% of the expected audience has downloaded.
  • FixedDeltas for files over 32 GiB sometimes fell back to a full download.

Capacity: Singapore and Sydney

  • ChangedSIN and SYD edge links raised from 400 to 800 Gbps each.
  • ChangedAsia-Pacific total capacity is now 14 Tbps.

CLI 2.8.0

  • Newash rehearse replays a recorded traffic shape against your title in a private window.
  • Newash delta report shows savings per source version.
  • Fixedash push resumed from the wrong chunk after a network change on Windows.

Manifest format 3

  • NewSigning keys can be held in a PKCS#11 module.
  • NewTwo-step key rotation with a trusted-keys list in the manifest.
  • ChangedFormat 2 manifests are still served and will be until 31 December 2027.

Santiago opens

  • NewPoint of presence SCL is live, bringing South America to two sites and the network to 24.
  • ChangedSouth American median latency to the edge fell from 41 ms to 12 ms for Chilean players.